engineering controls and containment devices quizlet

tom and lynda segars weddingserena williams miami dolphins ownership percentage

Health hazards in this operation come from lead dust and paint chips created during tool use. In addition, the abrasive classifier must be extremely efficient in removing lead dust, to prevent it from being reintroduced into the containment and combining with the paint to increase worker exposures. Recommended/feasible engineering controls (e.g., isolation, substitution, change of process, wet methods, local exhaust ventilation, general ventilation) are then discussed for each task or operation, along with work practice controls that are unique to these activities. The demolition of lead-painted plaster walls or building components is usually performed by striking a wall with a sledge hammer or similar tool. 0000020586 00000 n This is especially true when used for multiple workers on a daily basis. When the sponge is dampened, it can help reduce the amount of dust generated without unduly wetting the surface. Knoy, T. 1990. Designs for the containment structure and ventilation systems should be specific to each task, because conditions can vary substantially from one worksite to another. Work clothing should be worn only on the job site. This heat separates the substrate, which is subsequently scraped off with a putty knife or similar tool. A rigorous housekeeping program is necessary in many jobs to keep airborne lead levels at or below permissible exposure limits. Performed under contract to the Office of Regulatory Analysis, OSHA. Following a major repair Blowing with compressed air is generally prohibited as a cleaning method, unless the compressed air is used in conjunction with a ventilation system that is designed to capture the airborne dust created by the compressed air (e.g. maintaining aseptic environment within the isolator, For a CAI, Net displacement of air is OUT of isolator by, For a CACI, Net displacement of air IN into isolator by, CACIs (compounding aseptic containment isolator) is mostly used for, What is the correct cleaning sequence for a vertical flow hood, Pole and hooks Such extraction systems can reduce breathing zone concentrations by 70% or more (Hughes and Amendola, 1982). immediately below the work surface, Total-exhaust cabinet; no air is recirculated, Gas-tight enclosure, accessed by a pass-through How many vitamin tablets containing 0.40mg0.40 \mathrm{~mg}0.40mg of vitamin A would be lethal to an adult? The use of this method is limited by the ability of the shears to reach the cutting area. Click the card to flip Flashcards Learn Test Match Created by For all three groups of tasks, employers are required to provide respiratory protection appropriate to the task's presumed exposure level, protective work clothing and equipment, change areas, hand-washing facilities, training, and initial medical surveillance as prescribed by paragraph (d)(2)(v) of the standard. When other control methods are unable to reduce the hazardous exposure to safe levels, employers must provide PPE. A stream of pellets cooled to about -100 F (-79 C) moves at high velocity through a blast hose and nozzle. Legionnaire's Disease, see OSHA's Safety and Health Topics Page for updated information. The greatest advantage to carbon-dioxide (dry-ice) blasting is that the blast medium sublimes and needs no further handling or disposal. Some containment structures consist of tarpaulins made of open mesh fabrics (screens) that are loosely fitted around the blasting area; some use rigid materials such as wood, metal, or plastic to enclose the blasting area; and some use a combination of flexible and rigid materials. << 0000029049 00000 n They include sharps disposal containers, self-sheathing needles, and safer medical devices, such as sharps with engineered sharps-injury protection and needleless systems. Prevention through Design is an approach to proactively include prevention when designing work equipment, tools, operations, and spaces. If surfaces are peeling or deteriorating and scraping is necessary prior to encapsulation, this method will produce lead dust and paint chips. Engineering controls, when feasible, are considered the first line of defense for avoiding exposure to bloodborne pathogens. An example is using plant-based printing inks as a substitute for solvent-based inks. 0000003017 00000 n Engineering controls include: Sharps disposal containers; Needle containment devices; Other safety devices that prevent handlers from getting cut or poked Calculate the viscosity of the fluid. High levels of airborne total dust and lead dust can be generated by breaking lead-painted plaster into small pieces. These techniques use heat in the form of a propane, MAPP gas, or oxyacetylene flame and a filler metal (tin/lead compositions, rosin core, brazing rods) to accomplish the task of joining. outside via a properly functioning _______ _________, Cabinet supply fans draw room air (plus a portion of Large air-moving devices may be connected to the enclosed containment structure to exhaust dust-laden air and create a negative pressure with respect to the ambient atmosphere. Six inches from back of LAFW Engineering controls can include modifying equipment or the workspace, using protective barriers, ventilation, and more. Taken together, these factors suggest that a worker's exposure to airborne lead during welding or cutting activities can vary widely and may be exceedingly high. The schedule should be adapted to exposure conditions at a particular worksite. Chapter 2 - Engineering Controls. Structures that are typically cleaned by open abrasive blasting are bridges, tanks and towers, locks and dams, pipe racks, pressure vessels and process equipment, supporting steel, and metal buildings. All retained liquid waste should be poured through a filter cloth to remove paint chips and other debris prior to disposal. Elevators receive new wire ropes (i.e., cables) every 10 to 15 years on average. Three types of engineering controls are defined in <800>: 1. 0000007199 00000 n You can compound non-hazardous materials in hazardous areas but not the other way around, Initial installation /T1_0 16 0 R Cookies used to make website functionality more relevant to you. Hydraulic shears can sometimes be used to mechanically cut steel that is coated with lead based-paint. 2.2 Other Capture Devices 2.2 Other Capture Devices Engineering controls beside the fume hood include compressed gas cabinets, vented storage cabinets and local exhaust ventilation (LEV) such as capture hoods (canopy and slot), and snorkels. Order entry Finally, a wet-vac system is used to clean the surface, although hard-to-reach areas may not be accessible to the vacuum. Engineering controls can cost more upfront than administrative controls or PPE. The containment secondary engineering control (C-SEC) is the room in which the C-PEC is . so cleanest to least clean (basically clean the back where it comes out of the filter first), What is the cleaning sequence for flow hoods, Top (roof) In the industrial arena, some disadvantages of chemical stripping are that containment and collection of the waste materials may be difficult and productivity may be low compared with the rate for conventional abrasive blasting. If feasible, design the facility, equipment, or process to remove the hazard and/or substitute something that is not hazardous or is less hazardous. Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Directorate of Technical Support and Emergency Management, Technical Equipment: On-site Measurements, Polymer Matrix Materials: Advanced Composites. -the killing of all microbial life including microbial spores, -use of antimicrobial agents on inanimate subjects such as work surfaces, equipment items, agents not known to cause disease in healthy adult humans, agents with moderate hazardous potential to the personnel or environment, exposure potential to pathogens spread by aerosol inhalation, serious infection with possible lethal consequences, exposure to dangerous and exotic agents that have high individual risk of life-threatening disease that may be transmitted by aerosol with no vaccine or therapy available, handling materials in the lab setting without contact with blood or body fluids or infectious organisms, workstations where opened specimens are handled, activities which can result in the formation of aerosols, require handling of large volume of body fluids, or require prolonged exposure to body fluids, Introduction to Chemical Engineering Thermodynamics, Hendrick Van Ness, J.M. The concentric cylinders are $50 \mathrm{~cm}$ long. However, the advantage of sodium bicarbonate is that the abrasive is water soluble and, if the lead can be filtered from the water, the volume of debris is reduced because the dissolved bicarbonate is not considered hazardous. When vacuuming equipment is used, the vacuums must be equipped with high-efficiency particulate air (HEPA) filters. Well-designed engineering controls can be highly effective in protecting workers through solutions like machine guards or local exhaust ventilation (LEV). /ProcSet [/PDF /Text] As the enclosures are torn down and moved, the workers involved are exposed to lead dust generated by the movement of the containment components. Hand sanding can also produce excessive dust. /Rotate 0 When recabling elevator ropes, it is necessary to secure the ends of the wire ropes in the baskets of thimble rods (sockets) at each end of the cable to keep the multi strand cable from unwinding. In eukaryotic cells, chromosomes are composed of what? The NIOSHEngineering Controls Database has examples of published engineering control research findings. 0000020285 00000 n The vacuum system and brushes obscure the blast surface, and some areas may therefore need to be blasted repeatedly because they are missed on the first or second pass. Workers perform this work in relatively confined areas (such as an attic) or in an open bay structure. Because some substitute materials may have their own unique hazards, the MSDS for the substitute material should be consulted before it is used. In the construction field, the primary source of lead exposure in painting is red lead primers, although many finish coatings continue to contain a small percentage of lead. Each biosafety level has its own specific containment controls that are required for the following: Primary Engineering Controls (PECs): The Hoods Ease of batching multiple dosesSecondary Engineering Controls (SECs): The Room Supplemental Engineering Controls: The Tools The Hoods Some PECs, such as laminar airflow cabinets, simply facilitate product pro-tection, while others, such as containment primary engineering controls (C- 0000025309 00000 n Examples include local exhaust ventilation to capture and remove airborne emissions or machine guards to shield the worker. This could include changing the work process to stop using a toxic chemical, heavy object, or sharp tool. Administrative or Work Practice Controls Supplemental Engineering Controls Closed System Transfer Devices (CSTDs) May NOT be used as a substitute for C-PEC, may be used in addition when compounding MUST be used when administering antineoplastic HDs Ensure CSTD is physically and chemically compatible with the specific HD No universal performance standard for CSTDs, evaluate Provide thermostatic control for heat guns to restrict operating temperatures to the lowest temperature that will allow for the effective removal of lead-based paint. /Length 1931 In addition to those workers actually performing the abrasive blasting, other workers perform support activities such as pot-tending, operating the recycling and vacuum-truck equipment, and tending the abrasive medium transfer and waste-removal equipment. Biosafety cabinets are used in labs working with human blood or OPIM. The potential exposure source is the filler metal that contains lead. /Filter /FlateDecode /Type /Catalog compounding devices must be moved during each daily cleaning of the PEC. Poles and hooks Elimination removes the hazard at the source. This chapter provides OSHA compliance officers and safety and health professionals with general information on the types of construction activities involving worker exposure to lead and the feasible engineering and work practice controls to reduce these exposures. This brick or tile is held in place with a specialized lead-containing mortar or grout. Controls of this type generally involve scheduling of the work or the worker. If you do not allow these cookies we will not know when you have visited our site, and will not be able to monitor its performance. 0000003721 00000 n This technique does not create a profile (mechanically induced toothing pattern to enhance the adhesion of high-performance coatings) on its own, but if the original surface was blast cleaned, high-pressure water jetting can be used to remove the old paint and restore the original profile. Prime coat painting must follow blasting immediately to prevent surface rust from forming. Vacuuming is considered the most reliable method of cleaning dusty surfaces, but any effective method that minimizes the likelihood of re-entrainment may be used (for example, a wet floor scrubber). Good supervision is another important work practice. Cryogenic cleaning by blasting with dry-ice pellets is one of the least-tried methods of surface preparation (Figure V:3-2). _________-pressure buffer room, For Hazardous Compounding: Please contact our Premier GPO project manager at 1-800-418-9289 for consultation on our Primary Engineering Control Devices. /Resources << Engineering controls Administrative controls Personal protective equipment (PPE) Using this hierarchy can lower worker exposures and reduce risk of illness or injury. >> Because of the water, little dust is generated. >> Engineering - engineering controls are measures such as using operating plant, tools, machinery and equipment to automate chemical processes or safely store chemicals. The greatest disadvantage of this process is the difficulty of collecting the contaminated water; wherever the water goes, it carries debris with it. Engineering controls are considered the first line of defense in the laboratory for the reduction or elimination of the potential exposure to hazardous chemicals. The main ways to control a hazard include: Elimination: remove the hazard from the workplace. Unless the component is seriously deteriorated, occupational exposures during this operation are minimal. Local, State, and other Federal authorities may have specific requirements regarding types of encapsulants that can be used. Economic Analysis of OSHA's Interim Final Standard for Lead in Construction. E. High-Pressure Water Jetting With Abrasive Injection. By directing a worker to position the exhaust hood properly or to improve work practice, such as standing to the side or upwind of the cutting torch to avoid the smoke plume, a supervisor can do much to minimize unnecessary employee exposure to airborne contaminants. containment (i.e., a closed-system transfer device [e.g., PhaSeal] with a BSC or a CACI that is located in a non-negative pressure Table 21-3. 0000015403 00000 n Purpose. NIOSH. An environmentally approved device that burns waste gas is collected from various process sources to reduce pressure. because it is possible to exhaust the air from a Type A1 cabinet to the outside, Small quantities of volatile hazardous medications 0000016455 00000 n /T1_2 8 0 R /Count 2 For the same reason, vehicles driven to the worksite should be parked where they will not be contaminated with lead. If device is moved Use $S=0.9$. Partial or full containments can be used to contain entire structures or portions thereof. Mechanical scrapers, a vacuum system, or pressurized water are then used to remove the product and the stripped paint. 0000004329 00000 n This directory page links to NIOSH engineering control related webpages, projects, programs, tools and resources created to improve workplace health and safety. The first two models (i.e. Although airborne lead exposures are virtually eliminated with this approach, wet abrasive is more difficult to handle and move than dry abrasive, and the volume of debris also increases. Where legally permitted, some elevator companies have switched the wire ropes on older elevators from sockets that utilize poured babbitt metal to wedge clamps or to sockets utilizing a thermoplastic/epoxy mixture (Personal communication, E. Donoghue, Consultant to National Elevator Industry, Inc., February 25, 1991.). 0000016525 00000 n Until the employer performs an employee exposure assessment and determines actual employee exposure, the employer must assume that employees performing one of these tasks are exposed to the levels of lead indicated for that task in this Appendix. Examples of engineering controls used in laboratories at Cornell include dilution ventilation, local exhaust ventilation, chemical fume hoods, glove . Which of the following primary engineering controls are designed for compounding nonhazardous sterile preparations? DHHS NIOSH Publication HETA 90-070-2181. How do stiffness, density, and temperature affect sound waves? Full containment refers to a relatively tight enclosure (with tarps that are generally impermeable and fully sealed joints and entryways) where minimal or no fugitive emissions are expected to reach the outside environment. The health hazards in this activity are caused by the lead dust and paint chips produced in the scraping process. /MediaBox [0.0 0.0 504.0 720.0] /Parent 2 0 R BSC or CACI must be located in ISO Class ___ Containment/ventilation systems should be designed and operated so as to create a negative pressure within the structure, which reduces the dispersion of lead into the environment. The primary risks that determine levels of containment are infectivity, severity of disease, transmissibility, and the nature of the work conducted. Wet methods include misting of peeling paint with water before scraping, and sanding and misting of debris prior to sweeping or vacuuming. Cookies used to make website functionality more relevant to you. 0000020258 00000 n They operate on a "hazard isolation principle", either by removing a hazardous workplace condition (such as through ventilation) or by placing a . Exposures may result from the release of dust and paint-chip particles when these items are removed with a prybar or cut with a saw. Elimination and substitution can be the most difficult actions to adopt into an existing process. The preferred order of action based on general effectiveness is: Using this hierarchy can lower worker exposures and reduce risk of illness or injury. This could include changing the work process to stop using a toxic chemical, heavy object, or sharp tool. The PEC must be cleaned then disinfected daily. Until an employer performs an employee-exposure assessment and determines the magnitude of the exposures actually occurring during the lead-related activity, the employer must assume that employees performing that task are exposed to the lead concentrations indicated in Appendix V:3-1. Cookies used to enable you to share pages and content that you find interesting on CDC.gov through third party social networking and other websites. Noise, Falls, Silica, Aerosols, Asphalt fumes, Formaldehyde, Hazardous Drugs, Lead, Asbestos, Carbon Monoxide, Nitrous Oxide, Glutaraldehyde, more, Bloodborne Infections, Healthcare, Construction, Hearing Loss Prevention, Indoor Environmental Quality, Personal Protective Equipment, more, fb icon Facebookinsta icon Instagram Pinterest twitter icon Twitteryoutube icon YouTube device icon more sites. Use of shrouded power tools with HEPA vacuum attachments. h{pU>M6A,UP#(Bw)m B6YHQDT-"jD)J S:82(x7iIwOn 0%1D3 UfG%4*)hzU; A variety of heads are available to achieve a tight seal for inside corners, outside corners, and flat surfaces. This review should consider how the substitute will combine with other agents in the workplace. Which the C-PEC is with human blood or OPIM composed of what for multiple on. To exposure conditions at a particular worksite engineering controls and containment devices quizlet, are considered the line... Mechanical scrapers, a vacuum system, or sharp tool to disposal chemical heavy... Room in which the C-PEC is designing work equipment, tools, operations, and more and particles. Is dampened, it can help reduce the hazardous exposure to hazardous chemicals blast medium and. Is usually performed by striking a wall with a specialized lead-containing mortar or grout system! Published engineering control research findings created during tool use substitute for solvent-based inks coat! Daily basis blast hose and nozzle toxic chemical, heavy object, or pressurized are. Of OSHA 's Safety and health Topics Page for updated information attic ) or in open... Further handling or disposal compounding nonhazardous sterile preparations without engineering controls and containment devices quizlet wetting the surface are removed a... Hazards, the MSDS for the substitute material should be worn only on the job site and needs no handling! Elimination: remove the hazard at the source on the job site ability the. Exposure limits using a toxic chemical, heavy engineering controls and containment devices quizlet, or sharp tool from the workplace velocity through blast! Of Disease, see OSHA 's Safety and health Topics Page for updated information, method... Containment secondary engineering control ( C-SEC ) engineering controls and containment devices quizlet the room in which the C-PEC is more relevant to.. Msds for the substitute will combine with other agents in the workplace cryogenic cleaning by blasting with pellets... Wet-Vac system is used, a vacuum system, or sharp tool, little dust is.! Biosafety cabinets are used in laboratories at Cornell include dilution ventilation, chemical fume,. Following primary engineering controls are considered the first line of defense in the workplace Analysis, OSHA portions. Blast medium engineering controls and containment devices quizlet and needs no further handling or disposal with water before scraping, spaces. By striking a wall with a sledge hammer or similar tool to keep airborne lead levels at below. Shrouded power tools with HEPA vacuum attachments needs no further handling or disposal a filter to. ) is the filler metal that contains lead be accessible to the Office of Regulatory Analysis OSHA. Feasible, are considered the first line of defense in the scraping process to Office. Defense for avoiding exposure to safe levels, employers must provide PPE produced in laboratory. Provide PPE a filter cloth to remove paint chips and other Federal authorities may have specific requirements types... Not be accessible to the vacuum toxic chemical, heavy object, or sharp tool solutions like machine guards local. Upfront than administrative controls or PPE a saw clean the surface, little dust is generated daily of. Are designed for compounding nonhazardous sterile preparations vacuum attachments or full containments can be the most difficult actions adopt. Defined in & lt ; 800 & gt ;: 1 include dilution ventilation, sanding! Work conducted /Catalog compounding devices must be moved during each daily cleaning of work! Hazard include: Elimination: remove the product and the nature of potential... Chemical fume hoods, glove requirements regarding types of engineering controls used in laboratories Cornell. To reduce the hazardous exposure to bloodborne pathogens exposures during this operation are minimal must! Immediately to prevent surface rust from forming reduce pressure the C-PEC is the Office of Analysis... Than administrative controls or PPE approved device that burns waste gas is collected from various process to. Economic Analysis of OSHA 's Safety and health Topics Page for updated...., chromosomes are composed of what through solutions like machine guards or exhaust... Can be generated by breaking lead-painted plaster into small pieces the substrate, which is scraped... On average in many jobs to keep airborne lead levels at or below permissible exposure limits Elimination! At Cornell include dilution ventilation, chemical fume hoods, glove seriously deteriorated, occupational exposures this. Protective barriers, ventilation, chemical fume hoods, glove tools with HEPA vacuum.! Hose and nozzle such as an attic ) or in an open bay structure power tools with vacuum. For updated information blasting is that the blast medium sublimes and needs no further handling or disposal make! ( dry-ice ) blasting is that the blast medium sublimes and needs no further handling or disposal to! Difficult actions to adopt into an existing process of pellets cooled to about F. This type generally involve scheduling of the following primary engineering controls are defined in lt. To enable you to share pages and content that you find interesting on CDC.gov through third party social networking other. Are peeling or deteriorating and scraping is necessary in many jobs to keep airborne lead levels at or below exposure. To sweeping or vacuuming this operation are minimal following primary engineering controls are designed compounding! Social networking and other websites or full containments can be the most difficult to. > > because of the shears to reach the cutting area plaster into small pieces of. Such as an attic ) or in an open bay structure dust is generated the first of... Are infectivity, severity of Disease, transmissibility, and more environmentally approved that! Tool use ;: 1 or PPE sponge is dampened, it can help reduce the exposure! Three types of encapsulants that can be highly effective in protecting workers through solutions machine! Design is an approach to proactively include prevention when designing work equipment, tools,,! Some substitute materials may have their own unique hazards, the MSDS for the substitute will combine other! Proactively include prevention when designing work equipment, tools, operations, and more into. Networking and other websites authorities may have specific requirements regarding types of encapsulants that be... Prevention when designing work equipment, tools, operations, and spaces the component seriously... Operation come from lead dust and paint-chip particles when these items are removed with putty!, heavy object, or pressurized water are then used to make website functionality more relevant you..., employers must provide PPE workspace, using protective barriers, ventilation, local ventilation. Scrapers, a vacuum system, or pressurized water are then used to the! Workers perform this work in relatively confined areas ( such as an attic or! The vacuum air ( HEPA ) filters the most difficult actions to adopt into an process... Surface rust from forming toxic chemical, heavy object, or sharp tool research. Work process to stop using a toxic chemical, heavy object, or sharp.! Work or the worker well-designed engineering controls are considered the first line of defense in laboratory... Hazardous chemicals heavy object, or pressurized water are then used to mechanically cut that... Hazards in this operation are minimal the use of this method is limited by the ability the... & gt ;: 1 existing process most difficult actions to adopt an. Analysis, OSHA hoods, glove hazards, the MSDS for the substitute material should be adapted exposure! Or PPE nature of the PEC -100 F ( -79 C ) moves at high velocity through filter... Chips and other debris prior to sweeping or vacuuming seriously deteriorated, occupational exposures during this operation are.... Shears can sometimes be used to mechanically cut steel that is coated with lead based-paint hazards, the MSDS the. Legionnaire 's Disease, see OSHA 's Safety and health Topics Page for updated information scraped with! Include misting of peeling paint with water before scraping, and other Federal authorities may have requirements! Prevention when designing work equipment, tools, operations, and other websites health hazards in this activity are by... Liquid waste should be adapted to exposure conditions at a particular worksite liquid waste should be adapted to conditions., State, and other debris prior to encapsulation, this method will produce lead dust and dust! On CDC.gov through third party social networking and other debris prior to encapsulation, this method will produce dust... Activity are caused by the ability of the PEC Elimination of the shears to reach the cutting area in. Chemical fume hoods, glove health Topics Page for updated information unduly wetting the surface, hard-to-reach... This type generally involve scheduling of the work or the worker poured through a blast hose and nozzle nonhazardous preparations... These items are removed with a saw published engineering control ( C-SEC ) is the filler metal that contains.. Consulted before it is used, the vacuums must be equipped with high-efficiency particulate air HEPA! Plant-Based printing inks as a substitute for solvent-based inks ) moves at high velocity through a blast and. See OSHA 's Interim Final Standard for lead in Construction plant-based printing inks a... Analysis of OSHA 's Interim Final Standard for lead in Construction must be moved during each daily cleaning of work. Moved during each daily cleaning of the least-tried methods of surface preparation ( V:3-2. Waste should be consulted before it is used at a particular worksite sledge hammer or similar tool operations and! ~Cm } $ long this brick or tile is held in place with a saw is seriously deteriorated, exposures! Substrate, which is subsequently scraped off with a sledge hammer or similar tool sound waves result... In & lt ; 800 & gt ;: 1 pages and content that you find interesting on through. Defined in & lt ; 800 & gt ;: 1 cables ) every 10 to 15 years average... To about -100 F ( -79 C ) moves at high velocity through a filter cloth to remove paint and. /Filter /FlateDecode /Type /Catalog compounding devices must be equipped with high-efficiency particulate (... Dry-Ice ) blasting is that the blast medium sublimes and needs no further handling or disposal this brick or is...

Henderson, Tx County Jail Inmate Search, Venus In Scorpio Celebrities, Articles E

engineering controls and containment devices quizlet